How To Lay Artificial Grass Myself?

It can be a hugely satisfying weekend project to install artificial grass yourself, especially if your garden has been looking a bit muddy, a little, shall we say, shabby, or simply tired of the British weather. Although straightforward in concept, it does call for patience, careful measuring and common sense before anyone gets out the turf and lays it like a throw rug. A good job will be based on solid ground with a level base and good edging to hold the turf in its correct place. If it's done correctly, the finished article can be neat and tidy looking, sometimes quite naturally professional. But if not done correctly, the lawn can end up lumpy and loose or do its own wave routine every time somebody walks over it. That’s why it’s crucial to learn a few basics about how to install your new turf lawn first. The rewards are simple- a tidier lawn with less maintenance, ready for use all year round.

Step 1: Planning Should Come First, Not Excavating

a .Before the very first piece of old turf has been removed, site planning is required. The artificial turf must be planned to enhance the existing garden, not detract from it. Therefore, the ground should be assessed for shape and level, and accurate readings taken to consider where edges are to be terminated. The right attention should be paid to any winding borders, incorporated steps or awkward corners.

b. The design aims should also be borne in mind. A lawn for children and animals needs to be perhaps more robust and have a thicker pile. An ornamental patio adjacent to a pitch might require a cleaner, more formal finish. A small garden might work better on a coordinated and straightforward design so as to make the space feel larger. These decisions made‌ at the planning stage​ will prove to be advantageous subsequently.

c. Firstly, the shape should be‌ marked with chalk, string, or a spray of paint. This visual endorsement lends towards the ability to draw the final conclusion and does not leave a possibility to overcut through inadvertence. Measuring twice is no excess.

 

Step 2: Clear the Surface

a. Any old turf, weeds, stones, roots, or unwanted rubble should go when the grass has gone. If there is any original turf on the area, then it all has to be removed in its entirety, as it will not lay flat. There should be no lumpy or unstable ground when laying artificial turf. We must remove the existing turf surface in order to prepare the sub-base.

b. This can be the most labor-intensive of all the processes, if the existing lawn has established, dense turf, and it has uneven contours, a turf cutter can be extremely useful for the job, although it can also be done by using a spade and a bit of patience. The top layer should be cleared of any loose materials, including stones, old roots and any other items that will be obvious once it has been done. The cleaner the underlying surface, the sturdier it will be when finished.

c. The next thing to do after the first top layer has been removed is to check the area for any dips, soft spots or drainage problems. Dealing with these here is much easier than after the artificial grass has been laid. It‌ is not⁠ very glamorous at this stage, but this is where‌ decisions need to be made.

 

Ste​p 3: Ensure That‍ the Ground Drains‍ Correctly

a. Drainage is one of the most vital points when fitting artificial grass. Without free-flowing drainage, the surface could be prone to waterlogging or unwanted movement of the surface below the turf, which may have a detrimental effect on the turf's performance and lifespan. An ideal base area should be capable of allowing rainwater to pass through naturally rather than sit in discreet pockets.

b. Where the existing ground is overly boggy or heavy, it may require more extreme action in terms of preparation. Sometimes the structure of the soil doesn't drain effectively enough on its own, thereby making subbases necessary. The garden may well look fine above, but beneath it is what determines the progress of the turf for several years to come.

c. A slightly graded base can aid effective drainage, but it shouldn't be so precipitous that the lawn looks unstable and uneven. The goal is for a firm, stable surface, which will drain but not to the point where it becomes a trap of trapped moisture. This is essential to keep your grass in its pristine condition year on year.

 

Step 4: Construct a Suitable Sub-Base

a. Don't underestimate the importance of a properly installed sub-base. You should never try to lay artificial grass on bare, uneven ground and hope that it will work out somehow. A decent subbase will make sure the turf have a firm, evenly drained surface to rest on and will reduce the chance of it sinking, sliding or going uneven with use.

b. In many DIY installs, hardcore or MOT type 1 forms the core of the subbase, topped with a layer of sharp sand or other levelling medium, depending on the system to be installed. Buildups will differ, but the idea is similar: a level, solid, well-compacted surface before the grass goes down.

c. All layers should be properly compressed. This is important as loose particles will settle as time goes by and cause craters or pimples in the finished turf. The base should be nearly rock hard and very comfortable underfoot before the turf goes on. However, that was, it is well worth the effort.

 

Step 5: Carefully, Level the Surface

a. After installing the base, the surface will have to be made perfectly level. One of those tasks that sounds trivial, and then you realize it dictates all others. Dips will cause your turf to sink, bumps to become lumpish and depressions will hold water.

b. Tools for the job include a rake, a straight edge and a compactor to firm the surface from time to time. Make sure to inspect your base from all sides. Even minor discrepancies can become quite noticeable in your completed turf job and will certainly reduce its lifespan.

c. Now is the time when we need to be a little bit​ fussy⁠. Synthetic turf really demands accuracy. The higher the quality of the foundation, the more realistic and professional the conclusion will be.

 

Pro-Tip: Place a long straight edge over the base at many different angles to inspect. It is very much simpler to shape the lumps and bumps presently than try to do it once the turf layer is installed.

 

Step 6: Install a Weed Barrier

a. A weed membrane is a generally good investment. It provides an extra layer to help prevent weeds from coming through the new lawn from below. It is not an impervious barrier, but it does make maintenance easier and keeps the finished lawn looking a lot neater for much longer.

b. The membrane must be placed after the base is prepared and before the artificial turf is installed. It should be laid out across the entire surface, with overlaps in the appropriate places so that no gaps occur. Fix the edges so that the membrane remains flat and does not form unsightly ridges beneath the turf.

c. This is ideal for those with gardens that have previously been affected by weeds or where garden maintenance has long been a struggle. Artificial grass reduces maintenance and should not bring with it an extra minefield of problems. A weed membrane ensures that this does not happen.

 

Step 7: Place the Artificial Grass in the Proper Direction

a. Positioning is done by rolling out the turf and laying it into the desired area before any cutting or fixing takes place. The pile direction is one of the most important factors when positioning artificial turf. Artificial grass tends to look a bit different depending on how the fibres are placed and which way the light hits the turf. When using multiple pieces of artificial grass for one project, all the pieces must face in the same direction.

b. It’s​ best‍ to let the turf settle for a bit before you‌ even think about cutting it. It helps it relax‌ and makes it easier to work with. Once you have arranged the layout how you want, then you can take a good pair of scissors to cut the artificial turf edges down a little at a time; it is easy to get carried away.

c. If you require a number of strips, they should be placed side by side and checked before joining to make sure they are well aligned. A neat arrangement now will contribute to a much better appearance of the lawn later on.

Also, Read:-

What Goes Under Artificial Grass?

A Step-By-Step Guide To Laying Artificial Grass On Concrete

Artificial Grass Cost Estimation For Your Artificial Lawn

How Much is 1 Meter of Artificial Grass?

 

Step 8: Carefully Join the Seams

a. If the garden is to be longer than one length of artificial grass, it is at the joins that things matter most. If the pieces are joined badly, the joint will be immediately obvious and ruin the overall look. If done well, the joint will resemble an even natural edge and become virtually invisible.

b. Joining tape and glue are required here. The edges of the two length should be placed together with the piles going in the same direction, and then aligned so that the seam is as tight and flat as possible. The glue is dabbed onto the edges according to the manufacturers' instructions, before the edges are pressed carefully together, avoiding putting stress on the fibres.

c. This will need to be accomplished without haste. The joint should be examined from all angles to ensure it is flat and even before the glue sets. Worst case scenario, there will be a bump that can be moved with fingers, but best case, the join should be professional quality, forming an almost seamless transition from one section to the next.

 

Step 9: Fix the Edges

a. Edges are where some DIY jobs can start to go a little wrong. An artificial lawn that hasn't been secured around its edges can start to lift, move or look untidy. Edging boards, pins or other form of fixing will help to keep things flush and tidy.

b. The turf should be trimmed to fit exactly to the boundary lines. Where the turf borders onto paved areas, borders or patios, the edge should be trimmed neatly to produce a neat finish. On jobs where the turf is to be incorporated into a timber or other hard edge, fixing should be carried out using a method suitable for the hardness of the edge to ensure that the grass is held firmly in place.

c. One area you should never leave to chance is the edge. A clean edge is what finishing a lawn neatly looks like and is what prevents the whole thing from settling out of shape over time. It's the most obvious indicator of a job well completed.

 

Step 10: The Fibres Should be Brushed Upright:

a. Once the grass is fully laid and held down, finally it will generally require a brush. The fibres from artificial grass tend to arrive slightly flattened from when they have been rolled up. Brushing helps the grass to stand up, giving a more natural and lush appearance. A brush can be a stiff brush or a power brush, depending on the type of turf and the installer.

b. Brushing also helps to neaten any joins and can improve the overall appearance of the lawn. It is one of the easiest ways to make it look less like it's fresh from the packaging and more like part of a garden.

c. This stage is somewhat similar to doing a final tidy on a room. The work may be complete, but some final touch-up will make the work stand out as a professional job.

 

Pro-Tip: Brush against the pile and then go in the direction that looks best. This will cause the fibres to stand up more comfortably.

FAQs:

1. Can artificial grass be laid directly on soil?

You cannot put it directly on dirt. You must construct a certain level of stable sub base to ensure that the artificial grass has stability, drains well, and will last a long time.

2. Do I need a weed membrane under artificial grass?

Most DIY projects recommend using a weed barrier; it will help to reduce the amount of time you spend trying to keep weeds out of your landscape, plus it will help to keep your install looking clean and neat over time.

3. How long does DIY artificial grass installation take?

This varies depending on the size of the garden and if it is in any condition. A small format, uncomplicated garden may take up a weekend, while a larger or more difficult garden may take a lot longer, as the ground preparation will be a lengthy process.

Save 47%
best seller
Troon30 MM
£15.99
£8.49per m2
Save 50%
best seller
£13.99
£6.99per m2
Save 53%
best seller
£14.99
£6.99per m2
Save 19%
best seller
Monte Rei20 MM, 30 MM
£17.99
£14.49per m2
Save 64%
best seller
£26.49
£9.49per m2
Save 68%
best seller
£29.99
£9.49per m2
Save 68%
best seller
Velvet40 MM
£29.99
£9.49per m2
Save 50%
best seller
£26.99
£13.49per m2
Save 19%
best seller
£25.99
£20.99per m2
Save 56%
best seller
£30.99
£13.49per m2
Save 20%
best seller
£27.99
£22.49per m2
Save 55%
best seller
£39.99
£17.99per m2
Save 47%
best seller
£29.99
£15.99per m2
Save 55%
best seller
Rio30 MM
£39.99
£17.99per m2
Save 44%
best seller
Shamrock40 MM
£40.99
£22.99per m2
Save 45%
best seller
Golf15 MM, 20 MM
£39.99
£21.99per m2
Empty | Add to Compare | Add All to Cart
 My Wishlist (0)